Subdivision Possibility
Subdivision in Santa Cruz County isn’t for the faint of heart, but the upside can be significant—view lots can fetch ~$2M. Most preliminary work is complete. The concept here creates three new residential lots that do not interfere with the Nursery, Venue, or current residences.
- Lot 1 — ~15 acres: Nursery, commercial buildings, current residences, and wedding venue.
- Lot 2 — ~6.6 acres: Building site with ~200’ of road frontage.
- Lot 3 — ~5 acres: Building site.
- Lot 4 — ~5 acres: Building site.
Zoning
The property is zoned Special Use (SU) with a General Plan designation of Rural Residential (R-R). Per County guidance, SU allows all uses in the RA and R-1 zones.
Minimum Lot Size
Minimum lot size is determined by a matrix score. Five-acre parcels require a score between 61–80. Our estimate is around 80 based on the published criteria.
Site Context
Lot 2 — Building Site



Lot 3 — Building Site



Lot 4 — Building Site


